Theatre Wastewater Pipe

Email – 19 December from Chair

Hi All. I thought I would raise this problem before I forget. When we had the water leak in the theatre room from the masticator pump, I went down with Mark and had a walk around the perimeter.
What we discovered ids that the wastewater from the aircon system runs directly onto the floor ( no waste to drain) beside 1802 car park and fills the 1802 and my carpark 2002 with water when in use.

Read more ›

Posted in Building


Building Insurance

Premium adjustment to short term renewal to Nov 2022 –

From my records you were refunded for the overpayment of the insurance when the term was reduced to October as per credit invoice attached.

Please let me know if you require any further information.

Can you please also confirm where the cladding rectification work is up to so I can work on insurance offers for 2023/24.

Read more ›

Posted in Building


Building Cladding Proposal

Email 6 Dec 2022

Please see the attached proposal from Structural Diagnostics in relation to project managing the removal of combustible cladding from the building.

As discussed with Structural Diagnostics, should the proposal be accepted the following methods can be adopted:

  1. Going to A/EGM to approve the construction budget based upon the Project Planning completed by Structural Diagnostics (Structural Diagnostics’

Read more ›

Posted in Building


1404 Awning Leak

Read more ›

Posted in Units, Water Leaks


Level 21 Water Leak – Agreement to proceed

Read more ›

Posted in Units, Water Leaks


Generator Advice Nov 22 – Invoice & Approval

Read more ›

Posted in Power Generator


Generator Project Mgt Quote

Read more ›

Posted in Power Generator


Balustrade Oct 21 Repairs Invoices

Read more ›

Posted in Glass Balustrades


Balustrade Repairs Oct 21

Read more ›

Posted in Glass Balustrades


Balustrade – Follow Up Schedule, Oct 21

19 October

Hi All,

Just a quick update of the glass balustrade works by Apex Facades.

Work has taken longer than expected and they are completing a very thorough job. Please disregard the previous schedule.

They have been working on the 01 drop for the last 2 days and will continue,

Read more ›

Posted in Glass Balustrades